Practical

Your first month in a new Haddonfield house

Collections, permits, shutoffs and the calls worth making in week one, before the boxes are unpacked.

The first month in a new house is the only month where you can do inconvenient things easily, before the furniture is in the way and the routine is set. Here is the order I would use in Haddonfield.

What should happen on day one?

Utilities in your name, dated to closing, so nothing lands on the seller's account or yours twice. Confirm the providers for your specific address rather than assuming from the seller's closing paperwork, because the answer can differ block to block.

Then find the shutoffs. Water main, gas, electric panel. Label the panel while the house is empty and you can see what each breaker actually controls. This takes twenty minutes now and saves an hour in the dark later.

What about trash and recycling?

Call Public Works at 555 Centre Street, 856.429.0183, and get the current collection schedule rather than the one a neighbour remembers. Refuse, recycling, leaves, vegetative waste and chipper pickup all run on published schedules and they shift around holidays.

Put the container out the night before. It is the single most common new-owner mistake in any town, and it is free to avoid.

What if I want to change something on the house?

Start at Room 104 at Borough Hall, the Construction and Zoning office, for permits. If the house is inside the Historic District, exterior changes also need a Certificate of Appropriateness from the Planning Board, with design review by the Historic Preservation Commission first. Roofing and siding count. Paint color, decorative items and landscaping do not.

This is worth doing in the inspection period rather than month one if you are still buying. The neighborhoods page explains how to confirm whether a specific address is inside the district.

What is worth checking that nobody tells you to check?

The permit history on the house. Ask the construction office what was pulled and when. An addition from 1998 with no permit is not fatal, but you want to know about it in year one rather than at resale, when a buyer's inspector finds it for you.

Ask about the age of the roof, the furnace and the electrical service while you still have the seller's disclosure in your hand. Those three decide your first big expense.

What about the library and the schools?

The library is at 60 North Haddon Avenue, 856.429.1304, and a card takes about ten minutes. School registration runs through the district office at 95 Grove Street, 856.429.7510, and they will tell you what documents to bring.

What is the one thing I would do in week one?

Walk the block at the hour you will actually leave for work, and again on a weekend afternoon. You learn more about parking, noise and the walk to the station in twenty minutes than from any description, including mine. Then you know what you bought, which is a better feeling than guessing.

The homeowner resources page keeps every one of these numbers in one place.

Still in the inspection period?

Tell me the address and I will tell you what to check before it closes.

Ask Bob